| It's not a bad idea to run a extra
pipe through a concrete footing in a situation like this. As you can see
after the slab is poured you will not have another opportunity to run a
pipe if needed. If you don't install a pipe in a situation like this you
will be forced to run the pipe around the footing and have the pipe
exposed risking future damage.
Before Bay Window Concrete
Footing
Epoxy Rebar Into Existing
Concrete Foundation
Half Inch Anchor Bolts Ready
For Concrete
Wrap Pipes With Cardboard In
Concrete Footing
Three Quarter Inch Pipe In
Concrete Footing
Rebar Layout For Concrete
Footing Bay Window
Bay Window Footing Ready For
Inspection
Bay Window Footing Before
Concrete
Wet Concrete For Bay Window